| Category | Legislation | Responsibility for Compliance | How related to VHA | How frequently applicable | How changes are monitored | Proof of Compliance |
| Water |
Water Resources Act (1991) |
Maintenance Surveyor (existing properties) / Head of Development /Head of Design (new build)
|
When installing water supply |
Mostly in conjunction with new builds |
New laws sent to VHA; Thames Water contacts inform; courses attended |
Thames Water check all and will not allow work to proceed if not signed off as compliant. The Environment Agency gives permission for works where they are needed and monitors VHA work. All works checked for contamination |
| |
The Land Drainage Act (1991) |
Maintenance Surveyor(existing properties) / Head of Development /Head of Design (new build) |
If drainage needs replacing/renewing/repairing or for new build land |
When problems arise or for new builds |
New laws sent to VHA; Thames Water contacts inform; courses attended |
Thames Water check all and will not allow work to proceed if not signed off as compliant. The Environment Agency gives permission for works where they are needed and monitors VHA work. All works checked for contamination |
| |
Water supply (Water fittings) Regulations (1999) |
Maintenance Surveyor / Works Manager |
Purchasing |
Frequently |
Thames Water contacts inform; courses attended |
Thames Water check all and will not allow work to proceed if not signed off as compliant. The Environment Agency gives permission for works where they are needed and monitors VHA work. All works checked for contamination |
| Transport |
MOT emission tests |
Works Manager |
Fleet Vehicles |
Regularly |
DfT website checked regularly, also press. Test places print emissions levels and what they should be. Records kept by Support Services |
Emissions tests (must pass). Records kept by Support Services |
| |
Department for Transport Regulations |
Works Manager |
New Builds must be close to transport routes |
Design/planning new builds |
Housing Corporation website checked regularly, also circulars and press |
Visual checks |
| |
Housing Corporation Scheme Development Standards |
Head of Design |
New Builds must be close to transport routes |
Design/planning new builds |
Housing Corporation website checked regularly, also circulars and press |
Visual checks |
| Waste |
Environmental Act (1995) |
Works Manager / Head of Design / SHG
|
Materials used on new builds, contamination and how disposed. Site choice. / Skips use and disposal; batteries; items dumped on VHA property or land; items and substances used by VHA. |
New Build / Frequently |
Press and websites checked, and solicitors inform of changes. / Websites checked regularly for changes to regulations. Any changes fed back to staff, oiperational documents updated |
Spot checks on site, regular reports, compliance written into contracts. / Consignee Declarations; skips checked and ticked off daily; cameras in yard |
| |
Environmental Protection Act (1990) |
Works Manager / Head of Design / SHG
|
Materials used on new builds, contamination and how disposed. Site choice. / Skips use and disposal; batteries; items dumped on VHA property or land; items and substances used by VHA. |
New Build / Frequently |
Press and websites checked, and solicitors inform of changes. / Websites checked regularly for changes to regulations. Any changes fed back to staff, oiperational documents updated |
Spot checks on site, regular reports, compliance written into contracts. / Consignee Declarations; skips checked and ticked off daily; cameras in yard |
| |
Hazardous Waste Regulations (1996) |
Works Manager / Head of Design / SHG
|
Materials used on new builds, disposal of waste. / Disposal of items and substances |
New Build / Frequently |
Consultants inform of changes to materials allowed to use on new builds |
Compliance written into contracts. / Consignee Declarations; skips checked and ticked off daily; camera in yard |
| |
Control of Asbestos at work (2002) |
Head of Surveying |
Identification, removal and management of asbestos from existing homes. |
Quite frequently |
Croner, ARCA subscriptions; Trade press |
Onsite management by trained staff. Asbestos Register kept up to date. Type II survey documents monitored and kept |
| |
Clean Air Act (1993) |
Works Manager / Head of Design / SHG
|
No burning of substances by contractors on site. / Vehicle emissions tests; aerosol use |
New Build / Frequently |
Emissions levels shown on test reports along with compliant levels |
Compliance written into contracts. / Emissions tests done. No aerosols used |
| |
The Environmental Protection Regulations 2002 – Controls of Ozone Depleting Substances |
Head of IT |
Refrigerants used in air conditioning units at Hanney and Abingdon. The units need to be maintained through bi-annual checks which are carried out safely. |
Regularly |
Office of Public Sector Information website and website of contractor who supplied, fitted and maintains our air conditioning units. |
Contract agreement with installer (CFES Ltd) to carry out checks and meet legislation. |
| Natural Environment |
Wildlife and Countryside Act (1981) |
Head of Design / SHG |
Affects sites bought for new builds |
New Build |
Site investigations; press; websites; solicitors |
Site checks; written into contracts |
| |
Protection of Badgers Act (1992) |
Head of Design / SHG
|
Affects sites bought for new builds |
New Build |
Site investigations; press; websites; solicitors |
Site checks; written into contracts |
| |
Vale Local Plan - Chpt 10 (AONB & SSSIs) |
Head of Design / SHG
|
Awareness needed for new builds |
New Build |
Council notify of changes |
Planners are aware and will not allow development if not compliant |
| |
Oxford Structure Plan Policy No. EN1 |
Head of Design / SHG
|
Compliance needed in order to gain planning permission for new builds |
New Build |
Check website, press |
Planners are aware and will not allow development if not compliant |
| Built Environment |
Local Plan |
Head of Design / SHG |
Awareness needed for new builds |
New Build (design) |
Development Team pass on details |
Planning supervisor ensures compliance |
| |
The Building Act |
SHG / Head of Design
|
Building Regulations - for design of new buildings |
New Build (design) |
Construction press, websites, email newsletters, seminars |
Approval rests on compliance |
| |
The Housing Corporation's Sheme Development Standards |
SHG / Head of Design
|
Funding rests on achieving standards - internal and external design, efficiency |
New Build (design) |
Housing Corporation website indicates changes |
Ratings indicate whether standards achieved |
| |
Construction and Design Management Regulations |
SHG / Head of Design
|
Awareness needed for new builds (health and safety) |
New Build (design) |
Planning Supervisor advises |
Planning Supervisor ensures compliance - suitable contractor and risks mitigated |
| Energy Consumption |
The Building Act |
Director of Property Services |
Structural repairs or alterations and new builds must comply |
Quite frequently |
Seminars, trade journals, circulars, press meetings |
Clerk of Works and Building Surveyors inspect sites |
| |
Warm Homes and Energy Conservation Act (2000) |
Director of Property Services |
Fuel Poverty of Tenants |
Infrequently |
Publications, press, website of DTLR |
Improved when properties become void - monitoring SAP ratings show improvements |
| |
Energy Performance Directive |
Director of Property Services |
Developers must issue Energy Performance certificates for all new builds |
New Builds |
technical Publications (building), ABE building engineer; HouseMark; NHF Steering Group |
SAP Assessments; certificates issued by developers |
| Purchasing |
COSHH (1994) |
Health & Safety Group (Personnel Manager)
|
Substances used by VHA |
Frequently |
COSHH updated regularly and each substance purchased is checked against COSHH regulations. COSHH sheet produced |
COSHH sheets |
| |
Health and Safety Act (1974) |
Health & Safety Group (Personnel Manager) |
Substances and practices used by VHA |
Frequently |
Risk Assessments; Health and Safety Group meetings |
Health and Safety Group meets regularly; Risk Assessments kept on file |